PURPOSE
Designed for suspension of insulated or non-insulated stationary pipes
INSTALLATION
Vertical adjustments are possible once the pipe is in place. The lower nut is used to adjust the pipeline to the required elevation. The top nut is used to prevent loosening due to the vibration. The top nut should be tightened after adjustment. The top nut must securely be tightened to assure proper performance of hanger after adjustment
CONSTRUCTION
Consists of a yoke and a support strap made from shaped carbon steel strip and a joining bolt. 15° swing in either direction allows pipe to easily feed through. Pipe will not pinch when installing. Engineered design aligns bolt holes for quicker overhead installation
MATERIALS
Carbon Steel and any other materials can be provided upon request
APPROVALS
Manufactured to follow specifications MSS SP-69 & SP-58 Type 10
FINISH
Plain, Electro-Galvanized, Hot Dip Galvanized
TEMPERATURE
from -20 °C to +110 °C